Mandatory Requirements for Power Plant Personnel Positioning Systems – UWB Positioning System Technical Specifications
When implementing a personnel positioning system in a power plant using UWB positioning technology, the following mandatory requirements and technical specifications must be met to ensure the system’s stability, safety, and functionality in the complex environment of a power plant:
I. Core Mandatory Requirements
- High-precision positioning capability
- Static positioning error : ≤30 cm, meeting the precise positioning requirements of critical areas in power plants, such as high-voltage equipment rooms and densely packed pipeline zones.
- Dynamic positioning error : ≤1 meter, enabling trajectory tracking during personnel movement and ensuring reliability in scenarios such as inspections and maintenance.
- Environmental adaptability
- Protection rating : IP67 and higher, dustproof and waterproof, suitable for the harsh conditions of power plants, including high temperature, high humidity, and dusty environments.
- Electromagnetic compatibility : By passing electrostatic discharge immunity tests at severity level 3 and radio-frequency electromagnetic field radiation immunity tests, stable operation is ensured even under strong electromagnetic interference, such as in the vicinity of high-voltage equipment.
- Safety and Reliability
- Redundant design : Supports hot backup for base stations and dual-link data transmission, preventing system outages caused by single-point failures.
- Data encryption : Employ AES-256 or Chinese national cryptographic algorithms to ensure the security of positioning data transmission and storage.
II. Technical Specifications for UWB Positioning Systems
- Hardware Specifications
- Positioning base station :
- Coverage radius : The indoor coverage radius of a single base station is ≥80 meters (without obstructions), and the outdoor coverage radius is ≥200 meters.
- Deployment density : Depending on the complexity of the power plant’s structure, deploy one base station for every 500–1,000 square meters to ensure full signal coverage.
- Location tag :
- Battery life : ≥72 hours (continuous operation mode), supports fast charging (fully charged within 2 hours).
- Alarm function : Integrates one-touch SOS emergency calling, fall detection, and inactivity timeout alerts, with a response time of ≤3 seconds.
- Positioning base station :
- Software Specification
- Localization algorithm Supports both TOA (Time of Arrival) and TDOA (Time Difference of Arrival) modes, catering to diverse application requirements.
- Electronic fence Supports polygonal and circular fence configurations; unauthorized entry triggers a three-level alarm (local audio‑visual alert, SMS notification, and platform push).
- Traceability : Supports playback of up to 3 months of historical trajectory data, with a trajectory point density of ≥1 point per second, ensuring the accuracy of accident analysis.
- System Integration Specification
- Interface open : Provides RESTful API interfaces, supporting seamless integration with power plant systems such as SIS, MIS, and access control.
- Multi-system collaboration : Integrated with video surveillance and gas detectors, it automatically retrieves footage from nearby cameras and displays gas concentration readings upon alarm activation.
III. Functional and Performance Extension Requirements
- 3D positioning support
- Supports 3D modeling and positioning of complex power plant structures, such as multi‑storey buildings and underground utility tunnels, with a positioning accuracy of ≤50 cm.
- Multi-Modal Fusion Positioning
- Integrating Bluetooth AOA and Beidou RTK technologies enables seamless indoor–outdoor switching, ensuring comprehensive positioning coverage across all scenarios in the power plant.
- Intelligent analysis function
- Personnel Behavior Analysis : Track the duration of statisticians’ stays in each area, identify high-risk hotspots, and optimize inspection routes.
- Skills Matrix Assessment : Correlate personnel location data with the equipment defect detection rate to assess areas of skill gaps.
IV. Implementation and Operations & Maintenance Standards
- Deployment Requirements
- Base station installation : Employs PoE power supply and mesh networking to reduce cabling costs, with support for hot-swappable maintenance.
- Tag distribution : Personnel positioning cards are issued uniformly and may be used only by the cardholder; lending to others is strictly prohibited. Any damage or loss must be reported promptly.
- Operations and Maintenance Requirements
- Fault Response : 24/7 technical support, with a fault resolution time of ≤4 hours.
- System Upgrade : Supports remote OTA upgrades, with at least two feature enhancements and security patch updates provided annually.
The above are videos related to the UWB positioning system’s technical specifications, covering the underlying principles, system architecture, functional demonstrations, and real-world use cases.